Power Plant On-Line Monitoring System Phase I Project Successfully Operated

     Shanghai Sobo Industrial Co., Ltd. Project: Heilongjiang Shuangyashan State Power Plant Cable Disaster Online Monitoring System Project. It was successfully operated on September 25, 2008. It has been operating successfully for 180 days so far. All the sensors, acquisition modules, on-site acquisition servers, system buses and system software of the online monitoring system of this project are produced by our company. The temperature sensing cables and detection modules are provided by Haiyue Automation Research Institute. The following on-site operation pictures of the same project:< /p>

   The monitoring host placed in the monitoring center of the network control building

                                  Monitoring host placed in the monitoring center of the network control building

      The monitoring host placed in the monitoring center of the network control building

                                  normal operating system software interface

                         Field-installed data collection server host

2# machine cable monitoring control cabinet

 

Shanghai Sobo Industrial Co., Ltd. Project: Heilongjiang Shuangyashan State Power Plant Cable Disaster Online Monitoring System Project. It was successfully operated on September 25, 2008. It has been operating successfully for 180 days so